Model Railways 1982 September
  • Model Railways 1982 September

Model Railways 1982 September

£0.65
Tax included

Model Railways 1982 September

Quantity
Last items in stock

 

Paypal - the easy simple payment option.

 

3-5 working days for small orders. Up to 10 days for larger orders.

 

14-day Returns if unopened. Buyer pays for return postage.

 

All pictures are for illustration only.

 

Overseas? Please email us to discuss your requirements.

Good condition.

Layout, Rise End Quarry, Cromford and High Peak in 4mm scale. (Geraint Hughes).
In the Tudor Tradition. Showing how, and how not, to build in Half Timber. Text, pictures. (Alan Downes).
Diesel modifications, converting a Lima class 33 into a class 26. Text.
Signalling at Buckingham part 1, basic construction. (Peter Denny).
Layout construction part 3, good connections. Getting baseboards aligned correctly. (Martin Brent).
The Adams Radial, how one was built in 4mm scale. Text, diagrams, drawings. (John Martin).
Buildings for Borchester, building a Goods Shed. text, diagrams, drawings, pictures. Based loosley on the one built by the GNR at Hatfield, Herts. (Frank Dyer).
A loco for 7mm scale, assembling the mechanism part 2. Continuing the saga of the underframe. Text/diagrams. (Jem Harrison).
Motor Survey art 3. XT60 and Slimline. Two more popular motors discussed. (Iain Rice).
Narrow Gauge, live steam and fun. Putting the case for narrow gauge modelling in general and 16mm scale steam in particular. (Tom Cooper).

MR82P.B039
1 Item
Used